Friday, 21 June 2013

Gowri Avenue Anakaputhur, Chennai

Project Overview - Gowri Avenue
Type Bedroom Area Price Floor No Floor Plan
Apartments / Flats 1 BHK 670 Sq ft Rs. 24.79 lakhs Ground Floor View floor plan
Apartments / Flats 2 BHK 745 Sq ft Rs. 27.57 lakhs 2 View floor plan
Apartments / Flats 2 BHK 745 Sq ft Rs. 27.57 lakhs 1 View floor plan
Apartments / Flats 2 BHK 755 Sq ft Rs. 27.94 lakhs 1 View floor plan
About Project - Gowri Avenue
Possession: Feb 2013

Floor Plan - Gowri Avenue

  • Gowri Avenue
  • Gowri Avenue
  • Gowri Avenue
Project Specifications - Gowri Avenue
Structure:
  • Structure would be of R.C.C. Framed Structure. All Partition Walls will be of 4 ½" thick.
Joineries:
  • Main Door for each Flat would be of Teakwood frame with Single Shutter Panelled Door.
  • All other Doors would be well seasoned Country Wood with Single Shutter flush doors and Bathroom would be of Solid PVC.
  • Windows & Ventilators would be with Country Wood with Single Shutter would be provided.
  • Window Shutters would be provided with 4mm glass.
  • All Windows would be secured with M.S.Grill. The Design of Grill will be common for all flats.
Flooring:
  • Flooring would be of Vitrified Tiles and Bathroom flooring would be anti skid Ceramic Tiles.
Toilets:
  • Wall Dado: Glazed Tiles upto a height of 7 feet.
  • Water Closet: One White IWC for Common Toilet and One White EWC for other Toilet.
  • Two Wash Basins (all in white colour) would be provided for each flat.
  • One C.P. Hot and Cold Wall Mixture with Shower and One C.P. Tap for Closet would be provided for each bathroom along with one Health Faucet.
  • One SS Handle would be fixed near the closet to hold for support.
  • All Water Lines would be with P.V.C. pipes duly concealed.
  • All Drainage Lines would be with PVC pipes within the building and with Heavy Duty PVC pipes outside the building (and the manhole outside the building would be covered with RCC slabs).
Electrical:
  • All Flats serviced with Three Phase connection duly concealed.
  • All Internal wiring for lighting would be with 1/18 wire.
  • Wiring for Geyser, Grinder and Refrigerator would be with 3/20 wire.
  • A.C. Points for two bedrooms would be with 7/20 wire.
  • Hall, Bedroom would be provided with four points each (Two Light Points, One Fan Point and One 5 amps Plug Point). One Light Point in Balcony would be provided.
  • Kitchen would be provided with two Light Points, One Fan Point, One 15 amps Points and One 5 amps Plug Point.
  • Toilets would be provided with One Light Point, One 5 amps Plug Point and One 15 amps Point for Geyser
  • In Terrace Two Light Points, One Light Point in each Landing and Four Light Points in the Ground Floor common area would be provided.
  • Inverter with battery will be provided for each flat for power backup.
Painting:
  • Main Door of each Flat would be Varnish finished. All Other Doors and would be with Two coats of Enamel over one coat of Primer finish. Grills would be with Two Coats of Enamel Paint over One Coat of Primer. Internal Walls will be finished with Putty and Two Coats of Emulsion Paints and External Walls would be provided with Weather Coat.
Water Supply & Drainage System:
  • Water Supply will be with bore water.
  • One Branded Motor would be provided for lifting Bore Water to OHT, Also One sump will be provided and One Motor will be provided to lift the water from sump to OHT.
Weathering Course:
  • The weathering course would be provided suitably.
Lofts & Cupboards:
  • One RCC Loft would be provided in the Bedrooms.
  • One open Cudappah cupboard would be provided in the Bedrooms.
  • One open RCC Loft would be provided in the kitchen. An open Cudappah cupboard, size of which depending on space availability would be provided in the kitchen.
Kitchen:
  • The Kitchen work top would be of Kitchen Granite Slab and Stainless Steel Sink. Two Long Body Tap would be provided at Sink.
Miscellaneous:
  • One Car Parking for each flat.
Note:
  • If any other work to be done additionally will be charged and the same should be informed well in advance with the necessary payments.
Project Payment Plan - Gowri Avenue
  • At the time of booking: 10%
  • At the time of registration: 30%
  • During centering work for stilt floor roof slab: 15%
  • At the time of respective floor lintel level: 10%
  • At the time of respective floor roof slab: 10%
  • During brick work for respective floor: 10%
  • During plastering work for respective floor: 5%
  • During painting work: 5%
  • Two weeks before handing over: 5%

0 comments:

Post a Comment